{"id":6838,"date":"2023-02-28T18:51:09","date_gmt":"2023-02-28T18:51:09","guid":{"rendered":"https:\/\/aae-iraq.com\/aae\/?post_type=project&#038;p=6838"},"modified":"2023-02-28T18:51:10","modified_gmt":"2023-02-28T18:51:10","slug":"mid-marshland-irrigation-system","status":"publish","type":"project","link":"https:\/\/aae-iraq.com\/aae\/ar\/project\/mid-marshland-irrigation-system\/","title":{"rendered":"Mid-Marshland Irrigation system"},"content":{"rendered":"<p>Engineering, supply and installation (EPC) of Mechanical work for gates, control<br>buildings, and cover storages with roads and local dams<\/p>","protected":false},"excerpt":{"rendered":"<p>Engineering, supply and installation (EPC) of Mechanical work for gates, controlbuildings, and cover storages with roads and local dams<\/p>","protected":false},"featured_media":0,"template":"","project-filter":[],"class_list":["post-6838","project","type-project","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/project\/6838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/project\/6838\/revisions"}],"predecessor-version":[{"id":6839,"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/project\/6838\/revisions\/6839"}],"wp:attachment":[{"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/media?parent=6838"}],"wp:term":[{"taxonomy":"project-filter","embeddable":true,"href":"https:\/\/aae-iraq.com\/aae\/ar\/wp-json\/wp\/v2\/project-filter?post=6838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}