Our full project list is too long for a single page, so it is limited here to recent representative work. Ask us for the complete reference list for your sector.

Multidisciplinary civil, structural, mechanical, piping, electrical and related construction works, executed through multiple call-off packages: reinforced concrete process tanks, treatment buildings, pipe racks, drainage, water-intake works and plant infrastructure.

Excavation, embankment shaping and stone rip-rap armor placement for the protected water-intake channel feeding the Main Outfall Drainage (MOD) Water Treatment Plant.

Construction of Nano-Filtration and Marshal Building facilities, including civil and structural works, mechanical/electrical interfaces, embedded items, HVAC, fire suppression, steel-structure elements and seven rolling doors.

Construction works for three reinforced concrete process tanks, including civil, mechanical, electrical, embedded/puddle flange interfaces, and steel-structure interfaces.

Construction works for one clarifier tank and two circular thickener tanks, including reinforced concrete works, mechanical and electrical interfaces, and embedded/puddle works required for process integration.

Construction of the Drum Screen Building, Sludge Building, and Open/Close Chemical Pit facilities as part of the wider water treatment call-off packages.

Compressed Air Building, Chemical Dosing 1 & 2, Shades, and Slab on Grade for external site equipment.

Building construction works for the Office of Statistics project, including civil and building works, labor and material supply, quality and safety compliance, and completion per contract requirements.
Procurement and construction works for a two-story, twelve-classroom school complex — classrooms, walkways, sports field areas, laboratory facilities, administrative buildings and external works.

Turnkey EPC delivery for the Thi-Qar Oil Products Distribution Company: civil and structural works, mechanical systems, HVAC, firefighting and fire suppression, electrical, plumbing, architectural finishing, testing/commissioning support and final handover.

Street construction served by sanitation infrastructure in the Bani Askari district and Al-Hai Al-Askari area of Al-Jibayish district.

Supply and execution of the connecting road between the Al-Bid'a project and the preemptive project in Basra Governorate, spanning 8.75 km.

A recurring line of work for AAE — asphalt paving, compaction and road-surfacing across multiple sites, from access roads at industrial facilities to urban connector roads, using a dedicated paving and compaction fleet.

Construction of playgrounds on properties belonging to Al-Gharraf district.

Construction of a football field for Petronas Malaysia at the Al-Gharraf oil field.

Four hydraulic structures with complete civil and mechanical works in Hor Al-Hammar, Al-Jibayish — part of the marshlands rehabilitation program.
Short clips from the Main Outfall Drainage (MOD) Water Treatment Plant site — pile driving, concrete pours, formwork and structural steel erection, day and night.
Piling works underway at the WTP site.
Crane placement of the de-aeration vessel.
Night-shift formwork and scaffolding on the Ultra-Filtration tank.
Concrete pour underway on a night shift at the WTP.
A night shift in full swing across the WTP site.
A walk across the completed process tanks at dusk.
We can share detailed case studies and contact references on request.