Our Projects

Selected Portfolio

A sample of recent work across southern and middle Iraq

Our full project list is too long for a single page, so it is limited here to recent representative work. Ask us for the complete reference list for your sector.

Main Outfall Drainage (MOD) Water Treatment Plant aerial view
Water Treatment · EPC

Main Outfall Drainage (MOD) Water Treatment Plant

Multidisciplinary civil, structural, mechanical, piping, electrical and related construction works, executed through multiple call-off packages: reinforced concrete process tanks, treatment buildings, pipe racks, drainage, water-intake works and plant infrastructure.

ClientDR/IGC; ENI/ZDFOD
Value$27,500,000
Contract No.4600039760
Start15/02/2022
Excavation and stone armor placement for the WTP water-intake channel
Water Treatment

Water Intake Works

Excavation, embankment shaping and stone rip-rap armor placement for the protected water-intake channel feeding the Main Outfall Drainage (MOD) Water Treatment Plant.

ClientDR/IGC; ENI/ZDFOD
Start15/02/2022
Interior of the Nano-Filtration building with membrane filtration racks
Water Treatment

Nano-Filtration & Marshal Buildings

Construction of Nano-Filtration and Marshal Building facilities, including civil and structural works, mechanical/electrical interfaces, embedded items, HVAC, fire suppression, steel-structure elements and seven rolling doors.

ClientDR/IGC; ENI/ZDFOD
Value$1,623,660
Contract No.4600039760-CO03
Start15/02/2022
Night-time concrete pour of the Ultra-Filtration tank at the WTP
Water Treatment · Process Tanks

Grit Removal, Stabilization & Ultrafiltration Tanks

Construction works for three reinforced concrete process tanks, including civil, mechanical, electrical, embedded/puddle flange interfaces, and steel-structure interfaces.

ClientDR/IGC; ENI/ZDFOD
Value$3,395,378
Start15/02/2022
Thickener tank reinforcement cage under floodlights at night
Water Treatment · Process Tanks

Clarifier & Two Thickener Tanks

Construction works for one clarifier tank and two circular thickener tanks, including reinforced concrete works, mechanical and electrical interfaces, and embedded/puddle works required for process integration.

ClientDR/IGC; ENI/ZDFOD
Value$3,666,545
Start15/02/2022
Workers completing the chemical pit tank at the WTP
Water Treatment

Drum Screen, Sludge & Chemical Pit Buildings

Construction of the Drum Screen Building, Sludge Building, and Open/Close Chemical Pit facilities as part of the wider water treatment call-off packages.

ClientDR/IGC; ENI/ZDFOD
Value$1,318,401 combined
Start15/02/2022
Piping and valve manifold for the chemical dosing works
Water Treatment

Compressed Air Building & Chemical Dosing

Compressed Air Building, Chemical Dosing 1 & 2, Shades, and Slab on Grade for external site equipment.

ClientDR/IGC; ENI/ZDFOD
Value$2,738,897
Start15/02/2022
Completed Office of Statistics building
Government Building

Office of Statistics, Suq Al-Shyookh

Building construction works for the Office of Statistics project, including civil and building works, labor and material supply, quality and safety compliance, and completion per contract requirements.

ClientMinistry of Construction & Housing
Value249,686,141 IQD
Duration09/2019 – 03/2020
Illustration of the two-story, twelve-classroom Ghernata school building
Government Building · Education

Ghernata School Project

Procurement and construction works for a two-story, twelve-classroom school complex — classrooms, walkways, sports field areas, laboratory facilities, administrative buildings and external works.

ClientThi-Qar Governorate
Value1,257,898,196 IQD
Start15/02/2022
Concrete pump truck pouring a multi-storey building structure
Government Building · Turnkey EPC

Office Building for the General Inspector

Turnkey EPC delivery for the Thi-Qar Oil Products Distribution Company: civil and structural works, mechanical systems, HVAC, firefighting and fire suppression, electrical, plumbing, architectural finishing, testing/commissioning support and final handover.

ClientOil Products Distribution Co., Thi-Qar
Value$61,770,000
TypeTurnkey EPC
Sewage pipe trench installation in Al-Jibayish
Infrastructure · Roads

Streets & Sewage Services, Al-Jibayish

Street construction served by sanitation infrastructure in the Bani Askari district and Al-Hai Al-Askari area of Al-Jibayish district.

ClientThi-Qar Reconstruction Fund
Value1,916,415,000 IQD
Duration12/2021 – 10/2022
Asphalt road paving works in Basra
Infrastructure · Roads

Al-Bid'a Connector Road, Basra (8.75 km)

Supply and execution of the connecting road between the Al-Bid'a project and the preemptive project in Basra Governorate, spanning 8.75 km.

ClientMinistry of Water Resources
Value2,683,275,000 IQD
Start14/03/2022
Multiple asphalt pavers and rollers on an AAE road-paving project
Infrastructure · Roads

Road Projects

A recurring line of work for AAE — asphalt paving, compaction and road-surfacing across multiple sites, from access roads at industrial facilities to urban connector roads, using a dedicated paving and compaction fleet.

Covered sports facility structure under construction, Al-Gharraf district
Sports Facilities

Playgrounds, Al-Gharraf District

Construction of playgrounds on properties belonging to Al-Gharraf district.

ClientAl-Gharraf Municipality
Value412,000,000 IQD
Duration03/2020 – 01/2021
Artificial turf and sand infill installation for the Petronas football field
Sports Facilities · Oil & Gas

Petronas Football Field, Al-Gharraf Oil Field

Construction of a football field for Petronas Malaysia at the Al-Gharraf oil field.

ClientPETRONAS
Duration02/2019 – 04/2019
Hydraulic gate structures under construction in the Hor Al-Hammar marshlands near Al-Jibayish
Water Resources · Marshlands

Hydraulic Structures, Hor Al-Hammar

Four hydraulic structures with complete civil and mechanical works in Hor Al-Hammar, Al-Jibayish — part of the marshlands rehabilitation program.

ClientMarshlands Rehabilitation Center / Al-Rafidain General Co.
Value11,923,025,000 IQD
Duration09/2019 – 03/2020
Site Videos

Construction in progress

Short clips from the Main Outfall Drainage (MOD) Water Treatment Plant site — pile driving, concrete pours, formwork and structural steel erection, day and night.

Pile Driving

Piling works underway at the WTP site.

De-Aeration Tank Lift

Crane placement of the de-aeration vessel.

UF Tank Formwork

Night-shift formwork and scaffolding on the Ultra-Filtration tank.

Night Concrete Casting

Concrete pour underway on a night shift at the WTP.

Night Shift Operations

A night shift in full swing across the WTP site.

Site Walkthrough

A walk across the completed process tanks at dusk.

Looking for a reference project in your sector?

We can share detailed case studies and contact references on request.